Solar equipment & CEC registry directory
Search CEC records for solar panels, inverters, batteries, energy storage, meters and power control systems. Compare exact configurations and original evidence.
Built from California Energy Commission records.
Understand the scope of a listing
Details make the difference.
Find a model. Check the configuration.
Take the evidence with you.
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataScroll the table to see ratings and registry evidence →
| Compare+ | Manufacturer / model | Type / electrical | Reported ratings | CEC observation | Details |
|---|---|---|---|---|---|
ELM Fieldsight LLCMG250-10-480-400-KPM110-6480 V AC · 660 kWh | Energy storage480 V AC | 250 kW660 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMG250-13-480-400-KPM110-9480 V AC · 990 kWh | Energy storage480 V AC | 250 kW990 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMG500-13-480-800-KPM110-10480 V AC · 1100 kWh | Energy storage480 V AC | 500 kW1,100 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-1480 V AC · 110 kWh | Energy storage480 V AC | 100 kW110 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-1ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-2ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-2480 V AC · 220 kWh | Energy storage480 V AC | 125 kW220 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-3480 V AC · 330 kWh | Energy storage480 V AC | 125 kW330 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-3ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-4480 V AC · 440 kWh | Energy storage480 V AC | 125 kW440 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-4ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-5480 V AC · 550 kWh | Energy storage480 V AC | 125 kW550 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-5ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-6ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-6480 V AC · 660 kWh | Energy storage480 V AC | 125 kW660 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-7ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-7480 V AC · 770 kWh | Energy storage480 V AC | 125 kW770 kWh | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-8ESS · PCS operating modes | Legacy PCS480 V | 125 kVAESS | Listed in CECNov 11, 2026 | ||
ELM Fieldsight LLCMGC125-5-480-50-KPM110-8480 V AC · 880 kWh | Energy storage480 V AC | 125 kW880 kWh | Listed in CECNov 11, 2026 | ||
| Energy storage480 V AC | 30 kW78 kWh | Listed in CECNov 11, 2026 | |||
| Energy storage480 V AC | 30 kW156 kWh | Listed in CECNov 11, 2026 | |||
EMMVEE Photovoltaic Power Private LimitedE370M72-B370 W nameplate · 338.2 W PTC | Solar panel39.8 V DC | 370 W DC338.2 W DC | Listed in CECNov 11, 2026 | ||
EMMVEE Photovoltaic Power Private LimitedE375M72375 W nameplate · 344.8 W PTC | Solar panel40 V DC | 375 W DC344.8 W DC | Listed in CECNov 11, 2026 | ||
EMMVEE Photovoltaic Power Private LimitedE375M72-B375 W nameplate · 342.9 W PTC | Solar panel40 V DC | 375 W DC342.9 W DC | Listed in CECNov 11, 2026 |
A clear view.
An informed decision.
The original record, always.
Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.
Follow the evidenceContext before conclusions.
A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.
How to read a listing