ABB

PVS-166-TL-POWER-MODULE-2-US

Meter · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

No display provided. These models are for rooftop and utility scale use. Meter data can be accessed easily via web portal on many device types

The figures below refer to PVS-166-TL-POWER-MODULE-2-US. Use the configuration table for other variants.

Power rating
Not applicable
Display type
N/A
PBI meter as reported
N
Technology
Not reported

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for PVS-166-TL-POWER-MODULE-2-US
CEC model / configurationPower ratingVoltage / displayObservationCompare
PVS-166-TL-POWER-MODULE-2-USMeter_List row 13Not applicableN/AListed in CEC

Source specifications and conditions

Additional source information for PVS-166-TL-POWER-MODULE-2-US. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Display type
N/A
Source notes
No display provided. These models are for rooftop and utility scale use. Meter data can be accessed easily via web portal on many device types
CEC listing date
2019-12-02
PBI meter as reported
N

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECPVS-166-TL-POWER-MODULE-2-US
    Archived CEC source