AXITEC

AC-275P/60S

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

275 W, 60 cell polycrystalline module, 5 busbars, white backsheet and frame, 1000V max system Vdc

The figures below refer to AC-275P/60S. Use the configuration table for other variants.

Nameplate DC power
275 W DC
Maximum-power voltage (DC)
31.46 V DC
PTC power (DC)
253.6 W DC
Technology
Multi-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for AC-275P/60S
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
AC-275P/60SPV Module-Full row 837275 W DC253.6 W DCListed in CEC

Source specifications and conditions

Additional source information for AC-275P/60S. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

NOCT (°C)
44.88
Module family
Polycrystalline
Cells in series
60
CEC listing date
2018-12-17
Module area (m²)
1.63
PTC rating (W DC)
253.6
Safety certification
UL 1703
Building-integrated PV
N
Maximum-power current Imp (A)
8.74
Short-circuit current Isc (A)
9.24
Open-circuit voltage Voc (V DC)
38.5
Maximum-power voltage Vmp (V DC)
31.46
Pmax temperature coefficient (%/°C)
-0.383

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECAC-275P/60S
    Archived CEC source