East Penn Manufacturing Co.

HT145ET

Battery · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

0.209 kW, 1.68 kWh, lead acid battery

The figures below refer to HT145ET. Use the configuration table for other variants.

Continuous discharge power
0.209 kW
Battery voltage (DC)
Not reported
Nameplate energy capacity
1.68 kWh
Technology
Lead Acid
JA12 declaration
N

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for HT145ET
CEC model / configurationContinuous discharge powerCapacityObservationCompare
HT145ETBattery row 1170.209 kW1.68 kWhListed in CEC

Source specifications and conditions

Additional source information for HT145ET. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

UL 1973 edition
Ed. 3 : 2022
CEC listing date
2025-09-11
UL 1973 certificate date
2024-07-01
UL 1973 certifying entity
UL
Certified JA12 control strategies
No Information Submitted
Manufacturer-declared round-trip efficiency (%)
No Information Submitted

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECHT145ET
    Archived CEC source