A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataEquipment overview
Energy Storage System paired with Enphase IQ Gateway for PCS functionality. May be paired with PV system.
The figures below refer to IQBATTERY-5P-1P-NA {208V}. Use the configuration table for other variants.
- Controlled apparent power
- 39.93 kVA
- Operating voltage
- 208 V
- PCS functionality
- ESS
- Technology
- Not reported
Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.
Exact configurations
CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.
| CEC model / configuration | Controlled apparent power | Voltage / display | Observation | Compare |
|---|---|---|---|---|
| IQBATTERY-5P-1P-NA {208V}PCS Data for Inverter and ESS row 278 | 39.93 kVA | 208 V | Listed in CEC | |
| IQBATTERY-5P-1P-NA {240V}PCS Data for Inverter and ESS row 279 | 46.08 kVA | 240 V | Listed in CEC |
Source specifications and conditions
Additional source information for IQBATTERY-5P-1P-NA {208V}. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.
- Source notes
- Maximum continuous current (192) and power (39.93) based on PV + ESS configuration. For ESS-only configuration each would be 128 A and 26.62 kVA. Power Control System test report confirms compliance with UL 1741 CRD (dated: April 8, 2023 and March 8, 2019) and UL 3141 Issue 2 Outline of Investigation (dated: October 9, 2024)
- Equipment type
- ESS
- CEC listing date
- 2025-02-03
- Export-only mode
- Y
- Import-only mode
- Y
- No-exchange mode
- N
- Unrestricted mode
- N
- Phase configuration
- Single
- PCS CRD document date
- 2024-12-17
- PCS CRD issuing entity
- Bureau Veritas Consumer Product Services
- Additional required devices
- Enphase IQ Gateway, at least one CT-200-SPLIT or CT-200-CLAMP for ESS, at least two CT-200-SPLIT or CT-200-CLAMP for consumption, at least one CT-200-SOLID for PV.
- Output voltage as reported (V)
- 208
- Export-only response time (seconds)
- 2
- Import-only response time (seconds)
- 1.95
- No-exchange response time (seconds)
- N/A
- Current measurement reference points
- ESS & Enphase IQ Gateway & external CTs.
- Unrestricted response time (seconds)
- N/A
- Maximum apparent power as reported (kVA)
- 39.93
- Maximum continuous current as reported (A)
- 192
Use the source row references above to inspect the conditions for each other configuration.
Documented compatibility
No specific equipment pairing has been verified for this model.
Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.
Registry observation history
Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.
- Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECIQBATTERY-5P-1P-NA {240V}
Archived CEC source - Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECIQBATTERY-5P-1P-NA {208V}
Archived CEC source