Power Control System with System Edge Box
Power control system · 2 exact configurations · California, US
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataEquipment overview
Export limiting from all sources
The figures below refer to Power Control System with System Edge Box. Use the configuration table for other variants.
- Controlled active power
- 100 kW
- Operating voltage
- 208 V
- PCS functionality
- Export Limiting from all Sources (PEL)
- Technology
- Not reported
Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.
Exact configurations
CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.
| CEC model / configuration | Controlled active power | Voltage / display | Observation | Compare |
|---|---|---|---|---|
| Power Control System with System Edge BoxPower Control Systems row 62 | 100 kW | 208 V | Listed in CEC | |
| Power Control System with System Edge BoxPower Control Systems row 61 | 100 kW | 480 V | Listed in CEC |
Source specifications and conditions
Additional source information for Power Control System with System Edge Box. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.
- UL 3141 edition
- OOI Issue 2 : 2024
- CEC listing date
- 2026-08-11
- PCS functionality
- Export Limiting from all Sources (PEL)
- Phase configuration
- L-N/L-L-L
- Integrated end product
- Gateway
- Scheduling conformance
- No
- UL 3141 certificate date
- 2026-02-05
- UL 3141 certifying entity
- CSA Group
- Additional required devices
- System Edge Box (SE-A3 or SE-A4) and Shanghai CHINT Power Systems Co., Ltd. Inverters (CPS SCA25KTL-DO/US-208)
- Maximum controlled current (A)
- 120
- Rated operating voltage(s) (V)
- 208
- Time to steady state (seconds)
- 18.16
- Maximum response time (seconds)
- 0.03
- Current measurement reference points
- Point Of Common Coupling (PCC)
- Maximum controlled active power (kW)
- 100
Use the source row references above to inspect the conditions for each other configuration.
Documented compatibility
No specific equipment pairing has been verified for this model.
Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.
Registry observation history
Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.
- Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECPower Control System with System Edge Box
Archived CEC source - Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECPower Control System with System Edge Box
Archived CEC source