A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataEquipment overview
The PCS allows the export of active power from the BESS to the Area EPS but shall not allow the import of active power from the Area EPS for BESS charing porposes.
The figures below refer to H3-70-Plus-US-L. Use the configuration table for other variants.
- Controlled active power
- 70 kW
- Operating voltage
- 208 V
- PCS functionality
- ESS Export Only Mode
- Technology
- Not reported
Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.
Exact configurations
CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.
| CEC model / configuration | Controlled active power | Voltage / display | Observation | Compare |
|---|---|---|---|---|
| H3-70-Plus-US-LPower Control Systems row 75 | 70 kW | 208 V | Listed in CEC | |
| H3-70-Plus-US-LPower Control Systems row 76 | 70 kW | 208 V | Listed in CEC |
Source specifications and conditions
Additional source information for H3-70-Plus-US-L. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.
- UL 3141 edition
- OOI Issue 2 : 2024
- CEC listing date
- 2026-08-11
- PCS functionality
- ESS Export Only Mode
- Phase configuration
- L-N/L-L-L
- Integrated end product
- Inverter
- Scheduling conformance
- No
- UL 3141 certificate date
- 2026-06-16
- UL 3141 certifying entity
- CSA Group
- Additional required devices
- Meter Model (DTSU666)
- Maximum controlled current (A)
- 194.3
- Rated operating voltage(s) (V)
- 208
- Time to steady state (seconds)
- 4.644
- Maximum response time (seconds)
- 1.945
- Current measurement reference points
- Point Of Common Coupling (PCC)
- Maximum controlled active power (kW)
- 70
Use the source row references above to inspect the conditions for each other configuration.
Documented compatibility
No specific equipment pairing has been verified for this model.
Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.
Registry observation history
Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.
- Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECH3-70-Plus-US-L
Archived CEC source - Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECH3-70-Plus-US-L
Archived CEC source