Primo GEN24 3.8 208-240 Plus SC
Meter · 1 exact configuration · California, US
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataEquipment overview
LED, remote via access point (web interface), remote via web interface, remote via web based monitoring platform. Primo GEN24 SC and Primo GEN24 Plus SC series are identical in construction. The Primo GEN24 Plus SC series can be used in an ESS by default. The Primo GEN24 SC series can be used in an ESS, after activating this feature.
The figures below refer to Primo GEN24 3.8 208-240 Plus SC. Use the configuration table for other variants.
- Power rating
- Not applicable
- Display type
- Web Interface
- PBI meter as reported
- N
- Technology
- Not reported
Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.
Exact configurations
CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.
| CEC model / configuration | Power rating | Voltage / display | Observation | Compare |
|---|---|---|---|---|
| Primo GEN24 3.8 208-240 Plus SCMeter_List row 336 | Not applicable | Web Interface | Listed in CEC |
Source specifications and conditions
Additional source information for Primo GEN24 3.8 208-240 Plus SC. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.
- Display type
- Web Interface
- Source notes
- LED, remote via access point (web interface), remote via web interface, remote via web based monitoring platform. Primo GEN24 SC and Primo GEN24 Plus SC series are identical in construction. The Primo GEN24 Plus SC series can be used in an ESS by default. The Primo GEN24 SC series can be used in an ESS, after activating this feature.
- CEC listing date
- 2026-09-01
- PBI meter as reported
- N
Documented compatibility
No specific equipment pairing has been verified for this model.
Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.
Registry observation history
Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.
- Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECPrimo GEN24 3.8 208-240 Plus SC
Archived CEC source