Fronius International GmbH

Primo GEN24 5.0 208-240

Meter · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

LED, remote via access point (web interface), remote via web interface, remote via web based monitoring platform. Primo GEN24 and Primo GEN24 Plus series are identical in construction. The Primo GEN24 Plus series can be used in an ESS by default. The Primo GEN24 series can be used in an ESS, after activating this feature.

The figures below refer to Primo GEN24 5.0 208-240. Use the configuration table for other variants.

Power rating
Not applicable
Display type
LED and web interface
PBI meter as reported
N
Technology
Not reported

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for Primo GEN24 5.0 208-240
CEC model / configurationPower ratingVoltage / displayObservationCompare
Primo GEN24 5.0 208-240Meter_List row 338Not applicableLED and web interfaceListed in CEC

Source specifications and conditions

Additional source information for Primo GEN24 5.0 208-240. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Display type
LED and web interface
Source notes
LED, remote via access point (web interface), remote via web interface, remote via web based monitoring platform. Primo GEN24 and Primo GEN24 Plus series are identical in construction. The Primo GEN24 Plus series can be used in an ESS by default. The Primo GEN24 series can be used in an ESS, after activating this feature.
CEC listing date
2021-11-12
PBI meter as reported
N

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECPrimo GEN24 5.0 208-240
    Archived CEC source