Ginlong Technologies Co., Ltd.

S6-EH2PxK03-SV-YD-L-US

Power control system · 6 exact configurations · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

The ESS may import active power from Area EPS while charging and may export active power to the Area EPS while discharging.

The figures below refer to S6-EH2PxK03-SV-YD-L-US. Use the configuration table for other variants.

Controlled active power
16 kW
Operating voltage
240 V
PCS functionality
ESS Unrestricted Mode
Technology
Not reported

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for S6-EH2PxK03-SV-YD-L-US
CEC model / configurationControlled active powerVoltage / displayObservationCompare
S6-EH2PxK03-SV-YD-L-USPower Control Systems row 8216 kW240 VListed in CEC
S6-EH2PxK03-SV-YD-L-USPower Control Systems row 8116 kW240 VListed in CEC
S6-EH2PxK03-SV-YD-L-USPower Control Systems row 8316 kW240 VListed in CEC
S6-EH2PxK03-SV-YD-L-USPower Control Systems row 8416 kW240 VListed in CEC
S6-EH2PxK03-SV-YD-L-USPower Control Systems row 7916 kW240 VListed in CEC
S6-EH2PxK03-SV-YD-L-USPower Control Systems row 8016 kW240 VListed in CEC

Source specifications and conditions

Additional source information for S6-EH2PxK03-SV-YD-L-US. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Source notes
where x = 9.6, 11.4, 12, 14, or 16
UL 3141 edition
OOI Issue 2 : 2024
CEC listing date
2026-10-21
PCS functionality
ESS Unrestricted Mode
Phase configuration
L-L
Integrated end product
Inverter
Scheduling conformance
No
UL 3141 certificate date
2026-09-08
UL 3141 certifying entity
SGS
Additional required devices
meter (DTSU666)
Maximum controlled current (A)
66.7
Rated operating voltage(s) (V)
240
Time to steady state (seconds)
6
Maximum response time (seconds)
1.5
Current measurement reference points
Point Of Common Coupling (PCC)
Maximum controlled active power (kW)
16

Use the source row references above to inspect the conditions for each other configuration.

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Oct 22, 2026 · California Energy CommissionFirst observed: Listed in CECS6-EH2PxK03-SV-YD-L-US
    Archived CEC source
  • Oct 22, 2026 · California Energy CommissionFirst observed: Listed in CECS6-EH2PxK03-SV-YD-L-US
    Archived CEC source
  • Oct 22, 2026 · California Energy CommissionFirst observed: Listed in CECS6-EH2PxK03-SV-YD-L-US
    Archived CEC source
  • Oct 22, 2026 · California Energy CommissionFirst observed: Listed in CECS6-EH2PxK03-SV-YD-L-US
    Archived CEC source
  • Oct 22, 2026 · California Energy CommissionFirst observed: Listed in CECS6-EH2PxK03-SV-YD-L-US
    Archived CEC source
  • Oct 22, 2026 · California Energy CommissionFirst observed: Listed in CECS6-EH2PxK03-SV-YD-L-US
    Archived CEC source