Jinko Solar Co., Ltd

JKM315PP-72

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

315 W Polycrystalline Module

The figures below refer to JKM315PP-72. Use the configuration table for other variants.

Nameplate DC power
315 W DC
Maximum-power voltage (DC)
37.2 V DC
PTC power (DC)
288.7 W DC
Technology
Multi-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for JKM315PP-72
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
JKM315PP-72PV Module-Full row 7703315 W DC288.7 W DCListed in CEC

Source specifications and conditions

Additional source information for JKM315PP-72. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Mounting
Rack
NOCT (°C)
45.1
Module type
Flat Plate
Long side (m)
1.924
Module family
Polycrystalline
Short side (m)
0.954
Cells in series
72
Module area (m²)
1.8354959999999998
PTC rating (W DC)
288.7
Source last update
2018-04-02
Safety certification
UL 1703
Parallel cell strings
1
Building-integrated PV
N
Maximum-power current Imp (A)
8.48
Short-circuit current Isc (A)
9.01
Open-circuit voltage Voc (V DC)
46.2
Maximum-power voltage Vmp (V DC)
37.2
Pmax temperature coefficient (%/°C)
-0.41

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECJKM315PP-72
    Archived CEC source