Lumos

L40-240-47-xx

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

240 W, 40 cell double glass monocrystalline module, 1500V max system Vdc. Where xx can be LC, RC, LM, RM, EM, PM, or IM. ‘xx’ represents the frame type.

The figures below refer to L40-240-47-xx. Use the configuration table for other variants.

Nameplate DC power
240 W DC
Maximum-power voltage (DC)
22.25 V DC
PTC power (DC)
221.4 W DC
Technology
Mono-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for L40-240-47-xx
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
L40-240-47-xxPV Module-Full row 9996240 W DC221.4 W DCListed in CEC

Source specifications and conditions

Additional source information for L40-240-47-xx. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

NOCT (°C)
43.5
Module family
Monocrystalline
Cells in series
40
CEC listing date
2024-03-21
Module area (m²)
2.28
PTC rating (W DC)
221.4
Safety certification
UL 61730
Parallel cell strings
1
Building-integrated PV
N
Maximum-power current Imp (A)
10.8
Short-circuit current Isc (A)
11.4
Open-circuit voltage Voc (V DC)
27.4
Maximum-power voltage Vmp (V DC)
22.25
Pmax temperature coefficient (%/°C)
-0.3696

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECL40-240-47-xx
    Archived CEC source