A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataEquipment overview
Inverter with Additional Devices
The figures below refer to 10-005025 {240V}. Use the configuration table for other variants.
- Controlled apparent power
- 9.6 kVA
- Operating voltage
- 240 V
- PCS functionality
- Inverter
- Technology
- Not reported
Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.
Exact configurations
CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.
| CEC model / configuration | Controlled apparent power | Voltage / display | Observation | Compare |
|---|---|---|---|---|
| 10-005025 {240V}PCS Data for Inverter and ESS row 986 | 9.6 kVA | 240 V | Listed in CEC |
Source specifications and conditions
Additional source information for 10-005025 {240V}. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.
- Source notes
- Power Control System test report (with issue date 1/8/2025) confirms compliance with UL 1741 CRD (dated: April 8, 2023 and March 8, 2019) and UL 3141 Issue 2 Outline of Investigation (dated: October 9, 2024) *The document date 8/25/2025 pertains to the PCS evaluation with the Lunar Meter Socket Adapter (LE-MSAC-01) with ConnectDER Inc., Meter Socket Adapter (V-1-A-X). This report complies with UL 1741 CRD (dated: April 8, 2023 and March 8, 2019) and UL 3141 Issue 1 Outline of Investigation (dated: January 11, 2024)
- Equipment type
- Inverter
- CEC listing date
- 2025-02-21
- Export-only mode
- Y
- Import-only mode
- Y
- No-exchange mode
- Y
- Unrestricted mode
- Y
- Source last update
- 2025-10-21
- Phase configuration
- Single
- PCS CRD document date
- 1/8/2025 8/25/2025*
- PCS CRD issuing entity
- CSA Group
- Additional required devices
- Whole Home Configuration: Lunar Bridge 90-001221 OR Lunar Meter Socket Adapter (LE-MSAC-01) with ConnectDER Inc., Meter Socket Adapter (V-1-A-X) Partial Home Configuration: Lunar Bridge 90-001221, and External CTs; HFCRB05/D1351000A/100mV-0.5C-xxx (where xxx is suffix code, blank, or alphanumeric), CS-xx-x- 1000-RC (where xx-x denotes coil length - window size), RCT-xxxL-Coil (where xxx denotes coil length - diameter size), or RCTxx-1000 (where xx denotes length of current transformer coil)
- Output voltage as reported (V)
- 240
- Export-only response time (seconds)
- 0.753598
- Import-only response time (seconds)
- 0.309262
- No-exchange response time (seconds)
- 0.226679
- Current measurement reference points
- Inverter, External Bridge, External CTs (when present), Meter Socket Adapter and Controller (when present)
- Unrestricted response time (seconds)
- 0.072534
- Maximum apparent power as reported (kVA)
- 9.6
- Maximum continuous current as reported (A)
- 40
Documented compatibility
No specific equipment pairing has been verified for this model.
Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.
Registry observation history
Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.
- Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CEC10-005025 {240V}
Archived CEC source