Lunar Energy, Inc.

L2-ESS-20KWH

Legacy PCS · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

ESS with Additional Devices

The figures below refer to L2-ESS-20KWH. Use the configuration table for other variants.

Controlled apparent power
9.6 kVA
Operating voltage
240 V
PCS functionality
ESS
Technology
Not reported

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for L2-ESS-20KWH
CEC model / configurationControlled apparent powerVoltage / displayObservationCompare
L2-ESS-20KWHPCS Data for Inverter and ESS row 9889.6 kVA240 VListed in CEC

Source specifications and conditions

Additional source information for L2-ESS-20KWH. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Equipment type
ESS
CEC listing date
2026-02-23
Export-only mode
Y
Import-only mode
Y
No-exchange mode
Y
Unrestricted mode
Y
Phase configuration
Single
PCS CRD document date
2025-08-25
PCS CRD issuing entity
CSA Group
Additional required devices
Lunar Meter Socket Adapter Controller (LE-MSAC-01) and ConnectDER Meter Socket Adapter (V-1-A-X)
Output voltage as reported (V)
240
Export-only response time (seconds)
0.753598
Import-only response time (seconds)
0.309262
No-exchange response time (seconds)
0.226679
Current measurement reference points
Inverter, External Devices
Unrestricted response time (seconds)
0.061535
Maximum apparent power as reported (kVA)
9.6
Maximum continuous current as reported (A)
40

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECL2-ESS-20KWH
    Archived CEC source