Mission Solar Energy LLC

MSE295SQ5K

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

295 W PERC Module White

The figures below refer to MSE295SQ5K. Use the configuration table for other variants.

Nameplate DC power
295 W DC
Maximum-power voltage (DC)
32.19 V DC
PTC power (DC)
272.1 W DC
Technology
Mono-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for MSE295SQ5K
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
MSE295SQ5KPV Module-Full row 10356295 W DC272.1 W DCListed in CEC

Source specifications and conditions

Additional source information for MSE295SQ5K. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Mounting
Rack
NOCT (°C)
45.51
Module type
Flat Plate
Long side (m)
1.644
Module family
Monocrystalline
Short side (m)
0.979
Cells in series
60
Module area (m²)
1.609476
PTC rating (W DC)
272.1
Safety certification
UL 1703
Parallel cell strings
1
Building-integrated PV
N
Maximum-power current Imp (A)
9.2
Short-circuit current Isc (A)
9.73
Open-circuit voltage Voc (V DC)
39.38
Maximum-power voltage Vmp (V DC)
32.19
Pmax temperature coefficient (%/°C)
-0.38

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECMSE295SQ5K
    Archived CEC source