NEXTRACKER LLC

NXPCS800K-HUD

Inverter · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

800 kW, 800 Vac Grid Support Power Conversion System with a 800 kVA liquid-immersed distribution transformer.

The figures below refer to NXPCS800K-HUD {800V}. Use the configuration table for other variants.

Continuous AC output
801.42 kW
Nominal AC voltage
800 V AC
CEC weighted efficiency
98 %
Technology
Hybrid inverter
UL 1741 SB in CEC source
Reported
CEC source lists
Solar + Battery

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for NXPCS800K-HUD
CEC model / configurationContinuous AC outputVoltage / displayObservationCompare
NXPCS800K-HUD {800V}Solar_Inverters row 1272 · Battery_Inverters row 560801.42 kW800 V ACListed in CEC

Source specifications and conditions

Additional source information for NXPCS800K-HUD {800V}. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Built-in meter
N
Firmware version(s) tested
No Information Submitted
UL 1741 SA certificate date
No Information Submitted
UL 1741 SB certificate date
[11/4/2022]
CSIP conformance as reported
N
UL 1741 SA certifying entity
No Information Submitted
UL 1741 SB certifying entity
Intertek
CEC grid-support listing date
2023-05-11

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECNXPCS800K-HUD {800V}
    Archived CEC source