A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataEquipment overview
Communicating with BDM micro inverters to report system performance including energy and power output. Monitored through a touch screen LCD interface and local and remote web portals.
The figures below refer to BDG-256P3. Use the configuration table for other variants.
- Power rating
- Not applicable
- Display type
- LCD
- PBI meter as reported
- N
- Technology
- Not reported
Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.
Exact configurations
CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.
| CEC model / configuration | Power rating | Voltage / display | Observation | Compare |
|---|---|---|---|---|
| BDG-256P3Meter_List row 505 | Not applicable | LCD | Listed in CEC |
Source specifications and conditions
Additional source information for BDG-256P3. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.
- Display type
- LCD
- Source notes
- Communicating with BDM micro inverters to report system performance including energy and power output. Monitored through a touch screen LCD interface and local and remote web portals.
- PBI meter as reported
- N
Documented compatibility
No specific equipment pairing has been verified for this model.
Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.
Registry observation history
Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.
- Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECBDG-256P3
Archived CEC source