Nuuko Solar GmbH

NKM690N-132BDG12

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

690 W, 132 cell bifacial monocrystalline module, 1500V max system Vdc

The figures below refer to NKM690N-132BDG12. Use the configuration table for other variants.

Nameplate DC power
690 W DC
Maximum-power voltage (DC)
40.17 V DC
PTC power (DC)
650 W DC
Technology
Mono-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for NKM690N-132BDG12
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
NKM690N-132BDG12PV Module-Full row 11073690 W DC650 W DCListed in CEC

Source specifications and conditions

Additional source information for NKM690N-132BDG12. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

NOCT (°C)
46.01
Module family
Monocrystalline
Cells in series
66
CEC listing date
2025-07-21
Module area (m²)
3.11
PTC rating (W DC)
650
Safety certification
UL 61730
Parallel cell strings
2
Building-integrated PV
N
Maximum-power current Imp (A)
17.18
Short-circuit current Isc (A)
18.26
Open-circuit voltage Voc (V DC)
48.08
Maximum-power voltage Vmp (V DC)
40.17
Pmax temperature coefficient (%/°C)
-0.297

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECNKM690N-132BDG12
    Archived CEC source