REPT BATTERO Energy Co., Ltd.

Y104R04-314

Battery · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

208.998 kW, 417.997 kWh Rechargeable Lithium-ion Battery System

The figures below refer to Y104R04-314. Use the configuration table for other variants.

Continuous discharge power
208.998 kW
Battery voltage (DC)
Not reported
Nameplate energy capacity
417.997 kWh
Technology
Lithium Iron Phosphate
JA12 declaration
N

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for Y104R04-314
CEC model / configurationContinuous discharge powerCapacityObservationCompare
Y104R04-314Battery row 768208.998 kW417.997 kWhListed in CEC

Source specifications and conditions

Additional source information for Y104R04-314. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

UL 1973 edition
Ed. 3 : 2022
CEC listing date
2024-09-11
UL 1973 certificate date
2024-07-18
UL 1973 certifying entity
TUV Rhainland of North America
Certified JA12 control strategies
No Information Submitted
Manufacturer-declared round-trip efficiency (%)
No Information Submitted

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECY104R04-314
    Archived CEC source