Silfab Solar Inc.

SIL295BL

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

295 W, 126 cell monocrystalline module, black backsheet

The figures below refer to SIL295BL. Use the configuration table for other variants.

Nameplate DC power
295 W DC
Maximum-power voltage (DC)
32.75 V DC
PTC power (DC)
263.2 W DC
Technology
Mono-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for SIL295BL
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
SIL295BLPV Module-Full row 15148295 W DC263.2 W DCListed in CEC

Source specifications and conditions

Additional source information for SIL295BL. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

NOCT (°C)
48.2
Module family
Monocrystalline
Cells in series
21
CEC listing date
2019-09-03
Module area (m²)
1.6650690000000001
PTC rating (W DC)
263.2
Safety certification
UL 1703
Parallel cell strings
6
Building-integrated PV
N
Maximum-power current Imp (A)
8.99133333333333
Short-circuit current Isc (A)
9.76209523809524
Open-circuit voltage Voc (V DC)
38.1538095238095
Maximum-power voltage Vmp (V DC)
32.75
Pmax temperature coefficient (%/°C)
-0.462

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSIL295BL
    Archived CEC source