SOCOMEC

SUNSYS-HES-L-C05

Energy storage · 32 exact configurations · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

100 kW, 203 kWh, 480 Vac, Lithium Iron Phosphate Energy Storage System with PCS functionality.

The figures below refer to SUNSYS-HES-L-C05 {100kW, 203.7kWh}. Use the configuration table for other variants.

Nameplate power
100 kW
Nominal AC voltage
480 V AC
Nameplate energy capacity
203.7 kWh
Technology
Lithium Iron Phosphate
UL 1741 SB in CEC source
Reported
JA12 declaration
Y (2022)

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for SUNSYS-HES-L-C05
CEC model / configurationNameplate powerCapacityObservationCompare
SUNSYS-HES-L-C05 {100kW, 203.7kWh}Energy Storage System row 6117100 kW203.7 kWhListed in CEC
SUNSYS-HES-L-C05 {100kW, 407.3kWh}Energy Storage System row 6123100 kW407.3 kWhListed in CEC
SUNSYS-HES-L-C05 {100kW, 611kWh}Energy Storage System row 6132100 kW611 kWhListed in CEC
SUNSYS-HES-L-C05 {150kW, 407.3kWh}Energy Storage System row 6124150 kW407.3 kWhListed in CEC
SUNSYS-HES-L-C05 {150kW, 611kWh}Energy Storage System row 6133150 kW611 kWhListed in CEC
SUNSYS-HES-L-C05 {150kW, 814.7kWh}Energy Storage System row 6143150 kW814.7 kWhListed in CEC
SUNSYS-HES-L-C05 {200kW, 1018.4kWh}Energy Storage System row 6156200 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {200kW, 407.3kWh}Energy Storage System row 6125200 kW407.3 kWhListed in CEC
SUNSYS-HES-L-C05 {200kW, 611kWh}Energy Storage System row 6134200 kW611 kWhListed in CEC
SUNSYS-HES-L-C05 {200kW, 814.7kWh}Energy Storage System row 6144200 kW814.7 kWhListed in CEC
SUNSYS-HES-L-C05 {250kW, 1018.4kWh}Energy Storage System row 6157250 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {250kW, 1222kWh}Energy Storage System row 6172250 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {250kW, 611kWh}Energy Storage System row 6135250 kW611 kWhListed in CEC
SUNSYS-HES-L-C05 {250kW, 814.7kWh}Energy Storage System row 6145250 kW814.7 kWhListed in CEC
SUNSYS-HES-L-C05 {300kW, 1018.4kWh}Energy Storage System row 6158300 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {300kW, 1222kWh}Energy Storage System row 6173300 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {300kW, 611kWh}Energy Storage System row 6136300 kW611 kWhListed in CEC
SUNSYS-HES-L-C05 {300kW, 814.7kWh}Energy Storage System row 6146300 kW814.7 kWhListed in CEC
SUNSYS-HES-L-C05 {350kW, 1018.4kWh}Energy Storage System row 6159350 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {350kW, 1222kWh}Energy Storage System row 6174350 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {350kW, 814.7kWh}Energy Storage System row 6147350 kW814.7 kWhListed in CEC
SUNSYS-HES-L-C05 {400kW, 1018.4kWh}Energy Storage System row 6160400 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {400kW, 1222kWh}Energy Storage System row 6175400 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {400kW, 814.7kWh}Energy Storage System row 6148400 kW814.7 kWhListed in CEC
SUNSYS-HES-L-C05 {450kW, 1018.4kWh}Energy Storage System row 6161450 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {450kW, 1222kWh}Energy Storage System row 6176450 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {500kW, 1018.4kWh}Energy Storage System row 6162500 kW1,018.4 kWhListed in CEC
SUNSYS-HES-L-C05 {500kW, 1222kWh}Energy Storage System row 6177500 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {50kW, 203.7kWh}Energy Storage System row 611850 kW203.7 kWhListed in CEC
SUNSYS-HES-L-C05 {50kW, 407.3kWh}Energy Storage System row 612650 kW407.3 kWhListed in CEC
SUNSYS-HES-L-C05 {550kW, 1222kWh}Energy Storage System row 6178550 kW1,222 kWhListed in CEC
SUNSYS-HES-L-C05 {600kW, 1222kWh}Energy Storage System row 6179600 kW1,222 kWhListed in CEC

Source specifications and conditions

Additional source information for SUNSYS-HES-L-C05 {100kW, 203.7kWh}. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Brand
Socomec
CEC listing date
2025-04-11
Source last update
2025-05-01
PV DC input capability
N
UL 9540 certificate date
2024-12-24
UL 9540 certifying entity
TUV Rheinland of North America
Firmware version(s) tested
[1.0.0]
UL 1741 SB certificate date
[7/12/2024]
UL 1741 SB certifying entity
TUV Rheinland of North America
Certified JA12 control strategies
Basic, TOU, Advanced DR
Maximum continuous discharge rate (kW)
100
Manufacturer-declared round-trip efficiency (%)
0.88

Use the source row references above to inspect the conditions for each other configuration.

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {600kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {550kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {500kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {450kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {400kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {350kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {300kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {250kW, 1222kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {500kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {450kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {400kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {350kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {300kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {250kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {200kW, 1018.4kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {400kW, 814.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {350kW, 814.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {300kW, 814.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {250kW, 814.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {200kW, 814.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {150kW, 814.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {300kW, 611kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {250kW, 611kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {200kW, 611kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {150kW, 611kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {100kW, 611kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {50kW, 407.3kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {200kW, 407.3kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {150kW, 407.3kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {100kW, 407.3kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {50kW, 203.7kWh}
    Archived CEC source
  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSUNSYS-HES-L-C05 {100kW, 203.7kWh}
    Archived CEC source