Zhejiang Sunpro Power Technology Co., Ltd.

SPDG490-N120M10

Solar panel · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

490 W, 120 half-cut cell double glass monocrystalline module, 1500V max system Vdc

The figures below refer to SPDG490-N120M10. Use the configuration table for other variants.

Nameplate DC power
490 W DC
Maximum-power voltage (DC)
35.66 V DC
PTC power (DC)
465.9 W DC
Technology
Mono-c-Si

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for SPDG490-N120M10
CEC model / configurationNameplate DC powerPTC (DC)ObservationCompare
SPDG490-N120M10PV Module-Full row 21856490 W DC465.9 W DCListed in CEC

Source specifications and conditions

Additional source information for SPDG490-N120M10. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

NOCT (°C)
43.4
Module family
Monocrystalline
Cells in series
20
CEC listing date
2024-09-11
Module area (m²)
2.11
PTC rating (W DC)
465.9
Source last update
2026-05-01
Safety certification
UL 61730
Parallel cell strings
6
Building-integrated PV
N
Maximum-power current Imp (A)
13.75
Short-circuit current Isc (A)
14.47
Open-circuit voltage Voc (V DC)
43.06
Maximum-power voltage Vmp (V DC)
35.66
Pmax temperature coefficient (%/°C)
-0.295

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECSPDG490-N120M10
    Archived CEC source