Solar equipment, documented.
Meters in CEC records
Solar performance meters with display type, reported PBI eligibility and original CEC source notes.
Built from California Energy Commission records.
Understand the scope of a listing
All equipment 35,051Solar panels 22,186Inverters 2,473Energy storage 6,837Batteries 991Meters 787Power control systems 94Legacy PCS 1,683
The directory
Details make the difference.
Find a model. Check the configuration.
Take the evidence with you.
i
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataScroll the table to see ratings and registry evidence →
| Compare+ | Manufacturer / model | Type / electrical | Reported ratings | CEC observation | Details |
|---|---|---|---|---|---|
Energy TrackingWEM-MX-240-DLCD w/o Back light. | MeterLCD w/o Back light. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-240-DBLLCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-240-NDComputer Monitor | MeterComputer Monitor | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-480-DLCD w/o Back light. | MeterLCD w/o Back light. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-480-DBLLCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-480-NDComputer Monitor | MeterComputer Monitor | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-D-EFCLCD w/o Back light. | MeterLCD w/o Back light. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-D-EFC-333LCD w/o Back light. | MeterLCD w/o Back light. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-D-EFC-5ALCD w/o Back light. | MeterLCD w/o Back light. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-D-EFC-LCLCD w/o Back light. | MeterLCD w/o Back light. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-DBL-EFCLCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-DBL-EFC-333LCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-DBL-EFC-5ALCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-DBL-EFC-LCLCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-DBL-EFC-LC-POLCD with Backlight. | MeterLCD with Backlight. | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-ND-EFCComputer Monitor | MeterComputer Monitor | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-ND-EFC-333Computer Monitor | MeterComputer Monitor | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-ND-EFC-5AComputer Monitor | MeterComputer Monitor | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEM-MX-ARV-ND-EFC-LCComputer Monitor | MeterComputer Monitor | Not applicableY | Listed in CECSep 22, 2026 | ||
Energy TrackingWEMMIntegrated Web Server | MeterIntegrated Web Server | Not applicableN | Listed in CECSep 22, 2026 | ||
Enphase Energy, Inc.EMULCD and web interface | MeterLCD and web interface | Not applicableN | Listed in CECSep 22, 2026 | ||
| MeterDigital | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterDigital | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 |
The evidence mattersA clear view.
A clear view.
An informed decision.
01
The original record, always.
Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.
Follow the evidence02
Context before conclusions.
A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.
How to read a listing