Solar equipment, documented.
Meters in CEC records
Solar performance meters with display type, reported PBI eligibility and original CEC source notes.
Built from California Energy Commission records.
Understand the scope of a listing
All equipment 35,051Solar panels 22,186Inverters 2,473Energy storage 6,837Batteries 991Meters 787Power control systems 94Legacy PCS 1,683
The directory
Details make the difference.
Find a model. Check the configuration.
Take the evidence with you.
i
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataScroll the table to see ratings and registry evidence →
| Compare+ | Manufacturer / model | Type / electrical | Reported ratings | CEC observation | Details |
|---|---|---|---|---|---|
Powerhouse DynamicseMonitor4Online or Mobile Device | MeterOnline or Mobile Device | Not applicableN | Listed in CECSep 22, 2026 | ||
| MeterN/A | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterMobile App | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
Real Goods SolarPVwatchWeb and LCD | MeterWeb and LCD | Not applicableN | Listed in CECSep 22, 2026 | ||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
Righthand EngineeringWinVerter-MonitorComputer Monitor | MeterComputer Monitor | Not applicableN | Listed in CECSep 22, 2026 | ||
Righthand EngineeringWinVerter-Monitor FX-MXComputer Monitor | MeterComputer Monitor | Not applicableN | Listed in CECSep 22, 2026 | ||
| MeterLED | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLED | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLED | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLED | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLED | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLED | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterRemote | Not applicableY | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 | |||
| MeterLCD | Not applicableN | Listed in CECSep 22, 2026 |
The evidence mattersA clear view.
A clear view.
An informed decision.
01
The original record, always.
Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.
Follow the evidence02
Context before conclusions.
A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.
How to read a listing