Solar equipment, documented.

Solar panels in CEC records

PV module records with DC nameplate and PTC ratings, electrical specifications and archived CEC evidence.

Built from California Energy Commission records.
Understand the scope of a listing

35,291Equipment records
650Manufacturers
7Equipment categories
Latest source checkOct 11, 2026
All equipment 35,291Solar panels 22,367Inverters 2,506Energy storage 6,855Batteries 996Meters 787Power control systems 94Legacy PCS 1,686
The directory

Details make the difference.

Find a model. Check the configuration.
Take the evidence with you.

i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data
22,203 models / 22,367 configurations
Export CSV

Scroll the table to see ratings and registry evidence →

Equipment models and representative configurations. Open a model to inspect every listed variant.
Compare+Manufacturer / modelType / electricalReported ratingsCEC observationDetails
Qcells North AmericaQ.TRON M-G2+ 425425 W nameplate · 398.4 W PTC
Solar panel32.42 V DC425 W DC398.4 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON M-G2+ 430430 W nameplate · 403.2 W PTC
Solar panel32.62 V DC430 W DC403.2 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON M-G2+ 435435 W nameplate · 408 W PTC
Solar panel32.82 V DC435 W DC408 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 610610 W nameplate · 573.8 W PTC
Solar panel47.1 V DC610 W DC573.8 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 615615 W nameplate · 578.6 W PTC
Solar panel47.3 V DC615 W DC578.6 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 620620 W nameplate · 583.4 W PTC
Solar panel47.5 V DC620 W DC583.4 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 625625 W nameplate · 588.2 W PTC
Solar panel47.7 V DC625 W DC588.2 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 630630 W nameplate · 593.1 W PTC
Solar panel47.89 V DC630 W DC593.1 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 635635 W nameplate · 597.9 W PTC
Solar panel48.09 V DC635 W DC597.9 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 640640 W nameplate · 602.8 W PTC
Solar panel48.28 V DC640 W DC602.8 W DCListed in CECOct 11, 2026
Qcells North AmericaQ.TRON XL-G2.3/BFG 645645 W nameplate · 607.6 W PTC
Solar panel48.47 V DC645 W DC607.6 W DCListed in CECOct 11, 2026
REC GroupREC275TP2 BLK275 W nameplate · 253.7 W PTC
Solar panel31.5 V DC275 W DC253.7 W DCListed in CECOct 11, 2026
REC GroupREC280TP2280 W nameplate · 258.4 W PTC
Solar panel31.7 V DC280 W DC258.4 W DCListed in CECOct 11, 2026
REC GroupREC280TP2 BLK280 W nameplate · 258.4 W PTC
Solar panel31.7 V DC280 W DC258.4 W DCListed in CECOct 11, 2026
REC GroupREC285TP2285 W nameplate · 263.2 W PTC
Solar panel31.9 V DC285 W DC263.2 W DCListed in CECOct 11, 2026
REC GroupREC285TP2 BLK285 W nameplate · 263.2 W PTC
Solar panel31.9 V DC285 W DC263.2 W DCListed in CECOct 11, 2026
REC GroupREC290TP2290 W nameplate · 267.9 W PTC
Solar panel32.1 V DC290 W DC267.9 W DCListed in CECOct 11, 2026
REC GroupREC290TP2 BLK290 W nameplate · 267.9 W PTC
Solar panel32.1 V DC290 W DC267.9 W DCListed in CECOct 11, 2026
REC GroupREC290TP2M290 W nameplate · 266.3 W PTC
Solar panel32.6 V DC290 W DC266.3 W DCListed in CECOct 11, 2026
REC GroupREC295NP295 W nameplate · 275.3 W PTC
Solar panel32.7 V DC295 W DC275.3 W DCListed in CECOct 11, 2026
REC GroupREC295TP2295 W nameplate · 272.7 W PTC
Solar panel32.3 V DC295 W DC272.7 W DCListed in CECOct 11, 2026
REC GroupREC295TP2 BLK295 W nameplate · 272.7 W PTC
Solar panel32.3 V DC295 W DC272.7 W DCListed in CECOct 11, 2026
REC GroupREC295TP2M295 W nameplate · 271 W PTC
Solar panel32.8 V DC295 W DC271 W DCListed in CECOct 11, 2026
REC GroupREC300NP300 W nameplate · 280.1 W PTC
Solar panel33 V DC300 W DC280.1 W DCListed in CECOct 11, 2026
The evidence matters

A clear view.
An informed decision.

01

The original record, always.

Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.

Follow the evidence
02

Context before conclusions.

A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.

How to read a listing