Solar equipment & CEC registry directory
Search CEC records for solar panels, inverters, batteries, energy storage, meters and power control systems. Compare exact configurations and original evidence.
Built from California Energy Commission records.
Understand the scope of a listing
Details make the difference.
Find a model. Check the configuration.
Take the evidence with you.
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataScroll the table to see ratings and registry evidence →
| Compare+ | Manufacturer / model | Type / electrical | Reported ratings | CEC observation | Details |
|---|---|---|---|---|---|
Fortress Power LLCEdgeOn Duo 15 Pro2 matching configurations | Hybrid inverter208 V AC | 11.6088 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCEdgeOn Duo 15 Pro2 matching configurations | Legacy PCS208 V | 11.4 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCEdgeOn Duo 7.52 matching configurations | Legacy PCS208 V | 5.5 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCEdgeOn Duo 7.52 matching configurations | Hybrid inverter208 V AC | 5.02 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCEdgeOn Duo 92 matching configurations | Hybrid inverter208 V AC | 6.1237 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCEdgeOn Duo 92 matching configurations | Legacy PCS208 V | 6.6 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-ENVY-10K2 matching configurations | Hybrid inverter208 V AC | 9.7577 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-ENVY-10K2 matching configurations | Legacy PCS208 V | 10 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-ENVY-12K2 matching configurations | Hybrid inverter208 V AC | 10.4994 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-ENVY-12K2 matching configurations | Legacy PCS208 V | 10.4 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-ENVY-8K2 matching configurations | Hybrid inverter208 V AC | 7.8599 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-ENVY-8K2 matching configurations | Legacy PCS208 V | 8 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Envy 15K2 matching configurations | Hybrid inverter208 V AC | 13.899 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Envy Duo 212 matching configurations | Legacy PCS208 V | 13.8 kVAInverter | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Envy Duo 212 matching configurations | Hybrid inverter208 V AC | 13.899 kW96.5 % | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-C261-ONot Applicable V AC · 261.24 kWh | Energy storageNot reported | 130.62 kW261.24 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-C314-ONot Applicable V AC · 313.49 kWh | Energy storageNot reported | 156.75 kW313.49 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-C366-ONot Applicable V AC · 365.74 kWh | Energy storageNot reported | 182.87 kW365.74 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-C418-ONot Applicable V AC · 417.99 kWh | Energy storageNot reported | 208.99 kW417.99 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-C5016-ONot Applicable V AC · 5016 kWh | Energy storageNot reported | 2,508 kW5,016 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-S1-O104.499 kWh | BatteryNot reported | 52 kW104.499 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-S2-O208.998 kWh | BatteryNot reported | 104 kW208.998 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-S260-O261.24 kWh | BatteryNot reported | 130.62 kW261.24 kWh | Listed in CECNov 11, 2026 | ||
Fortress Power LLCFP-Mega-S3-O313.497 kWh | BatteryNot reported | 156 kW313.497 kWh | Listed in CECNov 11, 2026 |
A clear view.
An informed decision.
The original record, always.
Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.
Follow the evidenceContext before conclusions.
A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.
How to read a listing