RCT Power Energy Technology Corporation

CESS932-500-02D

Legacy PCS · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

ESS with Additional CTs and Meters

The figures below refer to CESS932-500-02D. Use the configuration table for other variants.

Controlled apparent power
500 kVA
Operating voltage
480 V
PCS functionality
ESS
Technology
Not reported

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for CESS932-500-02D
CEC model / configurationControlled apparent powerVoltage / displayObservationCompare
CESS932-500-02DPCS Data for Inverter and ESS row 1328500 kVA480 VListed in CEC

Source specifications and conditions

Additional source information for CESS932-500-02D. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

Equipment type
ESS
CEC listing date
2025-07-11
Export-only mode
Y
Import-only mode
Y
No-exchange mode
N
Unrestricted mode
N
Phase configuration
Multi
PCS CRD document date
2025-03-11
PCS CRD issuing entity
TUV Rheinland
Additional required devices
ECH60-800, EEM-MA370
Output voltage as reported (V)
480
Export-only response time (seconds)
11.4
Import-only response time (seconds)
11
No-exchange response time (seconds)
N/A
Current measurement reference points
Inverter, External CTs and Meters
Unrestricted response time (seconds)
N/A
Maximum apparent power as reported (kVA)
500
Maximum continuous current as reported (A)
600

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECCESS932-500-02D
    Archived CEC source