Shenzhen Growatt New Energy Co., Ltd.

ARO 6.6H-C1-US

Battery · 1 exact configuration · California, US

Choose a configuration ↓
i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data

Equipment overview

3.5 kW, 6.6 kWh lithium iron battery system

The figures below refer to ARO 6.6H-C1-US. Use the configuration table for other variants.

Continuous discharge power
3.5 kW
Battery voltage (DC)
Not reported
Nameplate energy capacity
6.6 kWh
Technology
Lithium Iron Phosphate
JA12 declaration
N

Specifications are reported in the CEC source; SolarApprovals has not independently tested this equipment. A missing value does not mean zero or a failed certification.

Exact configurations

CEC annotations in braces identify the listed configuration and are not part of the manufacturer’s model number. Variants share this canonical page.

Exact CEC configurations for ARO 6.6H-C1-US
CEC model / configurationContinuous discharge powerCapacityObservationCompare
ARO 6.6H-C1-USBattery row 8493.5 kW6.6 kWhListed in CEC

Source specifications and conditions

Additional source information for ARO 6.6H-C1-US. Qualifiers, reported control modes and required devices are retained as written. Power-control listings do not establish arbitrary battery/inverter pairings.

UL 1973 edition
Ed. 2 : 2018
CEC listing date
2021-03-11
Source last update
2024-04-02
UL 1973 certificate date
2020-11-27
UL 1973 certifying entity
Intertek
Certified JA12 control strategies
No Information Submitted
Manufacturer-declared round-trip efficiency (%)
No Information Submitted

Documented compatibility

No specific equipment pairing has been verified for this model.

Shared voltage, a hybrid designation, or the same manufacturer does not establish compatibility. Check the manufacturer’s installation documents for exact model combinations, firmware, and operating conditions.

Registry observation history

Dates show when SolarApprovals observed a status. The first observation is not the original CEC listing date. History begins with our first import.

  • Sep 21, 2026 · California Energy CommissionFirst observed: Listed in CECARO 6.6H-C1-US
    Archived CEC source