Gotion, Inc. equipment
Inspect 9 Gotion, Inc. models and 9 exact configurations in CEC records. Compare specifications, registry observations and source documents.
Built from California Energy Commission records.
Understand the scope of a listing
Details make the difference.
Find a model. Check the configuration.
Take the evidence with you.
A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.
How to use this dataScroll the table to see ratings and registry evidence →
| Compare+ | Manufacturer / model | Type / electrical | Reported ratings | CEC observation | Details |
|---|---|---|---|---|---|
Gotion, Inc.ESD1126-05P676-G1126.2 V AC · 676 kWh | Energy storage1,126.2 V AC | 338 kW676 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.ESD1267-05P760-GNot Applicable V AC · 760 kWh | Energy storageNot reported | 380 kW760 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.ESD1331-05P5015Not Applicable V AC · 5015 kWh | Energy storageNot reported | 2,508 kW5,015 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.ESD563-05P338-G563.2 V AC · 338 kWh | Energy storage563.2 V AC | 169 kW338 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.ESD704-05P422-G704 V AC · 422 kWh | Energy storage704 V AC | 211 kW422 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.ESD844-05P507-G844 V AC · 507 kWh | Energy storage844 V AC | 253 kW507 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.ESD985-05P591-G985.6 V AC · 591 kWh | Energy storage985.6 V AC | 295.5 kW591 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.IFP72175207-314Ah1.0048 kWh | BatteryNot reported | 0.5024 kW1.0048 kWh | Listed in CECSep 21, 2026 | ||
Gotion, Inc.IFP81175200-300Ah0.96 kWh | BatteryNot reported | 0.48 kW0.96 kWh | Listed in CECSep 21, 2026 |
A clear view.
An informed decision.
The original record, always.
Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.
Follow the evidenceContext before conclusions.
A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.
How to read a listing