Solar equipment, documented.

MidNite Power Inc. equipment

Inspect 13 MidNite Power Inc. models and 15 exact configurations in CEC records. Compare specifications, registry observations and source documents.

Built from California Energy Commission records.
Understand the scope of a listing

35,594Equipment records
652Manufacturers
7Equipment categories
Latest source checkNov 6, 2026
All equipment 35,594Solar panels 22,562Inverters 2,528Energy storage 6,927Batteries 999Meters 787Power control systems 105Legacy PCS 1,686
The directory

Details make the difference.

Find a model. Check the configuration.
Take the evidence with you.

i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data
13 models / 15 configurations
Export CSV

Scroll the table to see ratings and registry evidence →

Equipment models and representative configurations. Open a model to inspect every listed variant.
Compare+Manufacturer / modelType / electricalReported ratingsCEC observationDetails
MidNite Power Inc.MN 15-12KW-AIO2 matching configurations
Legacy PCS208 V11.4 kVAInverterListed in CECNov 6, 2026
MidNite Power Inc.MN 15-12KW-AIO2 matching configurations
Hybrid inverter208 V AC10.193 kW96.5 %Listed in CECNov 6, 2026
BatteryNot reported8.192 kW16.076 kWhListed in CECNov 6, 2026
BatteryNot reported38.4 kW51.2 kWhListed in CECNov 6, 2026
BatteryNot reported42.24 kW56.32 kWhListed in CECNov 6, 2026
BatteryNot reported46.08 kW61.44 kWhListed in CECNov 6, 2026
BatteryNot reported11.52 kW15.36 kWhListed in CECNov 6, 2026
BatteryNot reported15.36 kW20.48 kWhListed in CECNov 6, 2026
BatteryNot reported19.2 kW25.6 kWhListed in CECNov 6, 2026
BatteryNot reported23.04 kW30.72 kWhListed in CECNov 6, 2026
BatteryNot reported26.88 kW35.84 kWhListed in CECNov 6, 2026
BatteryNot reported30.72 kW40.96 kWhListed in CECNov 6, 2026
BatteryNot reported34.56 kW46.08 kWhListed in CECNov 6, 2026
The evidence matters

A clear view.
An informed decision.

01

The original record, always.

Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.

Follow the evidence
02

Context before conclusions.

A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.

How to read a listing