Solar equipment, documented.

Shenzhen Megarevo Technology Co., Ltd. equipment

Inspect 35 Shenzhen Megarevo Technology Co., Ltd. models and 35 exact configurations in CEC records. Compare specifications, registry observations and source documents.

Built from California Energy Commission records.
Understand the scope of a listing

35,051Equipment records
645Manufacturers
7Equipment categories
Latest source checkSep 21, 2026
All equipment 35,051Solar panels 22,186Inverters 2,473Energy storage 6,837Batteries 991Meters 787Power control systems 94Legacy PCS 1,683
The directory

Details make the difference.

Find a model. Check the configuration.
Take the evidence with you.

i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data
35 models / 35 configurations
Export CSV

Scroll the table to see ratings and registry evidence →

Equipment models and representative configurations. Open a model to inspect every listed variant.
Compare+Manufacturer / modelType / electricalReported ratingsCEC observationDetails
Hybrid inverter240 V AC10.154 kW97.5 %Listed in CECSep 21, 2026
Legacy PCS240 V11 kVAInverterListed in CECSep 21, 2026
Hybrid inverter240 V AC10.177 kW97 %Listed in CECSep 21, 2026
Energy storage240 V AC10 kW38.4 kWhListed in CECSep 21, 2026
Hybrid inverter240 V AC11.598 kW97.5 %Listed in CECSep 21, 2026
Hybrid inverter240 V AC12.362 kW97.5 %Listed in CECSep 21, 2026
Legacy PCS240 V13200 kVAInverterListed in CECSep 21, 2026
Hybrid inverter240 V AC12.1371 kW96.5 %Listed in CECSep 21, 2026
Legacy PCS240 V13200 kVAInverterListed in CECSep 21, 2026
Hybrid inverter240 V AC12.2135 kW96.5 %Listed in CECSep 21, 2026
Legacy PCS240 V17600 kVAInverterListed in CECSep 21, 2026
Hybrid inverter240 V AC16.1988 kW96.5 %Listed in CECSep 21, 2026
Legacy PCS240 V17600 kVAInverterListed in CECSep 21, 2026
Hybrid inverter240 V AC16.1309 kW96.5 %Listed in CECSep 21, 2026
Hybrid inverter240 V AC5.081 kW97.5 %Listed in CECSep 21, 2026
Hybrid inverter240 V AC5.0897 kW97 %Listed in CECSep 21, 2026
Legacy PCS240 V5.5 kVAInverterListed in CECSep 21, 2026
Energy storage240 V AC5 kW38.4 kWhListed in CECSep 21, 2026
Hybrid inverter240 V AC6.082 kW97.5 %Listed in CECSep 21, 2026
Legacy PCS240 V6.6 kVAInverterListed in CECSep 21, 2026
Hybrid inverter240 V AC6.117 kW97 %Listed in CECSep 21, 2026
Energy storage240 V AC6 kW38.4 kWhListed in CECSep 21, 2026
Hybrid inverter240 V AC7.765 kW97.5 %Listed in CECSep 21, 2026
Hybrid inverter240 V AC7.765 kW97 %Listed in CECSep 21, 2026
The evidence matters

A clear view.
An informed decision.

01

The original record, always.

Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.

Follow the evidence
02

Context before conclusions.

A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.

How to read a listing