Solar equipment, documented.

Trystar, LLC equipment

Inspect 7 Trystar, LLC models and 14 exact configurations in CEC records. Compare specifications, registry observations and source documents.

Built from California Energy Commission records.
Understand the scope of a listing

35,594Equipment records
652Manufacturers
7Equipment categories
Latest source checkNov 6, 2026
All equipment 35,594Solar panels 22,562Inverters 2,528Energy storage 6,927Batteries 999Meters 787Power control systems 105Legacy PCS 1,686
The directory

Details make the difference.

Find a model. Check the configuration.
Take the evidence with you.

i

A registry listing is a starting point. CEC inclusion is not nationwide installation approval. Confirm the exact model and configuration with your utility and local authority.

How to use this data
7 models / 14 configurations
Export CSV

Scroll the table to see ratings and registry evidence →

Equipment models and representative configurations. Open a model to inspect every listed variant.
Compare+Manufacturer / modelType / electricalReported ratingsCEC observationDetails
Trystar, LLCOZPCS-EP40-0002 matching configurations
Inverter208 V AC17.2299 kW94 %Listed in CECNov 6, 2026
Trystar, LLCOZPCS-RS35-FB02 matching configurations
Inverter208 V AC34.3317 kW95 %Listed in CECNov 6, 2026
Trystar, LLCOZPCS-RS35-FB12 matching configurations
Inverter208 V AC34.3317 kW95 %Listed in CECNov 6, 2026
Trystar, LLCOZPCS-RS40-BB12 matching configurations
Inverter208 V AC17.2299 kW94 %Listed in CECNov 6, 2026
Trystar, LLCOZPCS-RS40-Bxx2 matching configurations
Inverter208 V AC17.516 kW93.5 %Listed in CECNov 6, 2026
Trystar, LLCOZPCS-RS40-FB12 matching configurations
Inverter208 V AC17.2299 kW94 %Listed in CECNov 6, 2026
Trystar, LLCOZPCS-RS40-Fxx2 matching configurations
Inverter208 V AC17.515 kW93 %Listed in CECNov 6, 2026
The evidence matters

A clear view.
An informed decision.

01

The original record, always.

Every CEC record leads back to its source workbook and check date. Archived files preserve the evidence even when a live list changes.

Follow the evidence
02

Context before conclusions.

A listing is one part of the picture. Model variants, utility requirements and installation conditions deserve the same attention.

How to read a listing